| |
| Planning "Engine": |
| |
 |
| |
| Planning “Engine”: Load Sequencing: |
| |
- Plan the order in which items will be placed on the truck
- Detect possible problems in orders
- Balance the load
- Minimize damage in transit
- Sequence on trucks will flow into sequence for order picking
|
| |
| Planning “Engine”: Optimize Schedule: |
| |
- Move tasks to improve the schedule
- Resource leveling
- Wait for inventory
- Dual-task & cross-dock opportunities
|
| |
| Major Benefits: |
| |
- Substantially reduces planning time and effort
- Plans are available very early in the day
- AutoScheduler considers a large number of problems and mitigates them
- Reduces total planning effort
- Total loading/unloading effort is reduced
- More efficient use of staff
- More “single-move” operations (dual-tasking and cross-docking)
- Higher peak capacity - prepares early when peak is coming
|
| |
| Planning “Engine”: Loading and Unloading: |
| |
- Tentatively schedule loading & unloading at their “ideal” times
- Estimate loading & unloading times
- Meet “load-ready” date with a specified margin
|
| |
| Planning “Engine”: Plan Inventory Moves: |
| |
- Given the scheduled loads and unloads, what extra inventory will be required?
- Is the inventory available at nearby warehouses?
|
| |
 |
 |